Preparing the Design
Library and technology setup, netlist and power-intent import, timing setup, and the readiness checks that gate entry into floorplanning.
- Library/technology setup and netlist + power-intent import
- Timing setup and physical/optimization controls before floorplanning
- Readiness checklist and the exit gate into the floorplan stage
- 12 vector figures & the Nimbus-8 worked example